Not Ur Average Girl

So What I’m Not Your Average Girl? I Don’t Meet The Standards of This World!

Updates on the laptop..

May14

I had couriered the Demand Draft and Form 60 to Dell on Saturday. They received it on Monday and the system processing has started. I checked the order status at Dell website yesterday and it states, Work in Progress. The estimated delivery date is 26th May.

Order status of my Inspiron 1525

Immediately on seeing the above page, I called my brother to tell him about it. And he told me to ask the Sales Executive, the time required to build the system.

When I tweeted about this, Sathya was quick to point out that the site was not reliable.

I talked with the Dell Sales Executive and he told that if all the parts are available in the factory, it takes one day. If the parts are not available, maximum two days are needed. The next day the laptop gets tested and after that it is handed over to the Logistics Dept. for the shipping.

Well.. am hoping that everything goes on well and I get it by this weekend :D

posted under Laptop

Email will not be published

Website example

Your Comment:

 

follow iGrace at http://twitter.com
IndiBlogger - Where Indian Blogs Meet