Laptop Chronicles - IV

Well well… the current status at Dell is Ship from Factory and that at Bluedart is In Transit.

Order Status 15/05 Shipping Status 17/05

The expected date of delivery is 20th. I checked the transit time @ Bluedart and it seems it takes 3-4 days for a shipment to reach Raipur from Chennai.

So.. the wait continues and am hoping to get it positively on 20th :D

Watch “We’re All In This Together” Preview

The much awaited DVD from Hillsong United, We’re All In This Together will be releasing in August ‘08. For the contents of the DVD, check the wikipedia page here.

Relevant Magazine has put up a 44 minutes preview of the disk which contains songs, documentary and all. Its a limited time affair and is up at the site from May 16th to 18th. Make sure to check it out.

We're All In This Together

Updates on the laptop..

I had couriered the Demand Draft and Form 60 to Dell on Saturday. They received it on Monday and the system processing has started. I checked the order status at Dell website yesterday and it states, Work in Progress. The estimated delivery date is 26th May.

Order status of my Inspiron 1525

Immediately on seeing the above page, I called my brother to tell him about it. And he told me to ask the Sales Executive, the time required to build the system.

When I tweeted about this, Sathya was quick to point out that the site was not reliable.

I talked with the Dell Sales Executive and he told that if all the parts are available in the factory, it takes one day. If the parts are not available, maximum two days are needed. The next day the laptop gets tested and after that it is handed over to the Logistics Dept. for the shipping.

Well.. am hoping that everything goes on well and I get it by this weekend :D